Validate before you submit
Run the rules on the file your reporting system produced. Each finding names the template, row and column, the values and the rule expression.
Platform
Validate EBA supervisory reporting exactly as the Data Point Model defines it, and manage the rules that do it.
EBA reports fail on validation rules that generic tools check partially or not at all: consistency between templates, rules that exist only in one release, the semantics of the DPM. Each failure found after submission means a resubmission.
ADAM (Advanced DPM Analysis Mechanism) works directly on the DPM and its validation logic. It runs the validation rules of the EBA and the extra data quality checks of the ECB (EGDQs) on your report files. The list of supported DPM-XL rule sets keeps growing as more authorities converge to this standard.
What it is for
Run the rules on the file your reporting system produced. Each finding names the template, row and column, the values and the rule expression.
Supervisors run the same rules on the reports that arrive, institution by institution.
Manage your own rules in DPM-XL next to the official ones: national rules for a supervisor, internal checks for a bank.
Call ADAM from your own product or pipeline through its library or API.
Who it is for
Data quality leads at authorities who receive EBA reports and maintain their own rule sets.
Teams that want the supervisor's checks before the deadline, whatever tool produced the file.
Reporting software vendors and consulting firms that need DPM validation inside their own products and projects.
How it works
An XBRL-XML or xBRL-CSV file, through the web application or the API.
The report is matched to the DPM release and module it was filed under.
Structural, dimensional and semantic checks, including the DPM-XL rules that compare templates.
Each finding with its cells, the values and the rule, ready to pass to whoever owns the figure.
Questions
XBRL-XML and xBRL-CSV instance data for EBA reporting. The conversion between the two uses XBridge, our open source converter.
ADAM works across DPM 1.0 and DPM 2.0 releases, and takes each new release as it is published.
Yes. ADAM Validator manages DPM-XL validations, including rules you write yourself.
Yes. ADAM Explorer is free and shows every EBA validation rule with its expression and release history.
We can help you with both.
Salamanca
Calle Concejo 9 1º D
37002 Salamanca
Madrid
Calle Fernando El Católico 86 posterior local C-12
28015 Madrid